Restricted Hours Noise Monitoring Results -- Evening time |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Station M3, Kwan Yick building |
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
End Time |
Weather |
Noise level (dB(A)), 5 min |
Major Construction Noise Source(s) Observed |
Other Noise Source(s) Observed |
Remarks |
Temp. (°C) |
Wind Speed (m/s) |
Noise Meter Model / ID |
Calibrator Model / ID |
Leq |
L10 |
L90 |
14-Feb-13 |
19:10 |
19:25 |
Cloudy |
66.6 |
68.2 |
64.3 |
No outdoor construction noise |
Mainly traffic noise |
- |
18 |
0.3 |
RION- NL31 (S/N 00603867) |
RION - NC73 (S/N 10997142) |
20-Feb-13 |
22:45 |
23:00 |
Fine |
67.2 |
68.5 |
65.0 |
No outdoor construction noise |
Mainly traffic noise |
- |
18 |
<5 |
B&K 2238 S/N: 2381580 |
B&K 4231 S/N: 3003246 |
26-Feb-13 |
21:20 |
21:35 |
Fine |
66.9 |
68.2 |
65.3 |
No outdoor construction noise |
Mainly traffic noise |
- |
21 |
0.3 |
RION- NL31 (S/N 00603867) |
RION - NC73 (S/N 10997142) |
|
|
|
Min. |
66.6 |
|
|
|
|
|
|
|
|
|
|
|
|
Max. |
67.2 |
|
|
|
|
|
|
|
|
|
[1] The data (M3_Evening Time) of 14 and 26
February were provided by Contract No. DC/2007/23. |
|
|
|
|
|
Calibration certificates for the noise
meter(s) and calibrator(s) used were included in the corresponding Monthly
EM&A Report for this Contract |
|
|
Station M5a, Chuk Lam Ming Tong |
|
|
|
|
|
|
|
|
|
|
|
|
|
Date |
Start Time |
End Time |
Weather |
Noise level (dB(A)), 5 min |
Major Construction Noise Source(s) Observed |
Other Noise Source(s) Observed |
Remarks |
Temp. (°C) |
Wind Speed (m/s) |
Noise Meter Model / ID |
Calibrator Model / ID |
Leq |
L10 |
L90 |
07-Feb-13 |
22:45 |
23:00 |
Fine |
58.7 |
61.1 |
50.9 |
Works in tunnel |
Road traffic at San Wan Drive |
According to contractor, general construction works was in
process accordance to CNP. |
19 |
<5 |
B&K 2238 S/N : 2381580 |
B&K 4231 S/N: 3003246 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min. |
58.7 |
|
|
|
|
|
|
|
|
|
|
|
|
Max. |
58.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|